Polarity.
Testing is carried out to verify:
- That the polarity is correct at the meter and consumer unit/distribution board.
- Single-pole control and protective devices are connected in the phase conductor only.
- Conductors are correctly connected to socket-outlets and other accessories/equipment.
- Centre-contact bayonet and Edison-type screw lamp-holders have their outer or screwed contacts connected to the earthed neutral conductor.
- All multi-pole devices are correctly installed.